VERICUT Users' Forum

Due to relentless spammers, we are no longer automatically accepting new forum registrations. If you wish to register for this forum, please send an e-mail to: info@cgtech.com

You are not logged in.

#1 2009-01-07 18:23:25

Tim Johnson
Member
From: Saint Joseph MI
Registered: 2006-06-02
Posts: 22

Transfering Tool Manager Gage Point to Fanuc Variables

I need Vericut to preread the gage points before any tool changing is completed;

N2 G91 G30 X0 Y0 Z0
#153=1
IF[#10006GT13.75]GOTO99001  <<<<<<<<<<<<<<<<<
M06 T06 (3" DIA 45 DEGREE LEAD FACE MILL)
M66
T07
#170=4020
#172=5002
#199=0
M[#926]
M[#927]
M98P5013
M09
M58
M05
G91 G30 X0 Y0 Z0
#153=#0
M01
.
.
.
IF[#913EQ2]GOTO108
/GOTO108
M99P101
N99001 #3000=1(TOOL LENGTH IS TOO LONG) <<<<<<<<<<<<<<<<<<
N99002 #3000=2(TOOL LENGTH IS TOO SHORT)
N108 M30 (END PROGRAM)
 

When the H value is read in the tool path subprogram #10006 does show the value in the Variables window.


Tim Johnson
CNC Programmer
LECO Corp.
---------------------
VERICUT 7.0.3 (64)

Offline

Board footer